![]() That’s farther than any spacecraft built for astronauts has ever flown.Īt the end of the mission the Orion spacecraft is due to splashdown in the Pacific Ocean off San Diego about 42 days after launch.Īrtemis I is the first of three missions on the schedule, with Artemis II in 2024 slated to take four crew and Artemis III due to take two astronauts- the first woman and the first person of color-to the lunar surface in 2025 or later. Lunar Flashlight was assigned to launch on a SpaceX rocket with a. For launches in the second half of 2022, see List of spaceflight launches in JulyDecember 2022. For all other spaceflight activities, see 2022 in spaceflight. ![]() Orion will enter an elliptical orbit of the Moon that will see them get to within 62 miles above its surface and about 40,000 miles beyond it. The launch Sunday occurred about 10 hours before the scheduled splashdown of NASA. Featuring the Boeing-built Core Stage, SLS successfully launched as part of the Artemis I Mission on November 16, 2022. This article lists orbital and suborbital launches during the first half of the year 2022. When Artemis I does finally lift-off it will embark on a 1.3 million miles (2.1 million kilometers) journey. ![]() high, the SLS is also a “Moon rocket” with 8.8 million pounds (3.9 million kg) of thrust. The SLS is a largest rocket constructed since the agency’s Saturn V “Moon rocket” was last used in 1973. spacecraft atop the mobile launcher at Launch Pad 39B at NASA’s Kennedy Space Center in Florida. SpaceX is gearing up to launch its first rocket of 2022 on Thursday evening (Jan. A brilliant blue sky serves as a backdrop for the Artemis I Space Launch System (SLS) and Orion.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |